Resources

The vocabulary of the plant, and what a pilot needs.

A glossary of the terms Chassira's agents work with, the standards the reasoning layer cites, and the inputs a plant brings to a pilot baseline. No white papers or calculators are published yet; this page is the reference we actually have.

14 terms4 standards familiesPilot baseline inputs

Standards the reasoning layer cites
  • IATF 16949: automotive quality management
  • APQP and PPAP: advanced product quality planning and production part approval
  • ISO 26262-aware functional-safety and crash-safety requirements
  • Recall, warranty and non-conformance procedures
  • Your weld, paint and torque specs and control plans

Retrieval is tenant-isolated and every answer carries its citation. Citing a standard is not a certification claim.

Glossary

14 terms

The process and quality terms that appear throughout the site.

Glossary

Body-in-white

The welded, unpainted body structure before paint and assembly. Hundreds of spot welds, laser seams, rivets and adhesive beads to crash-safety geometry.

Glossary

Gap-and-flush

The gaps between adjacent panels and how flush their surfaces sit. Measured at framing and final; the customer's first judgement of build quality.

Glossary

Framing

The body-shop station where panels and subassemblies are fixtured and joined into a dimensionally complete body. Where millimetre geometry is decided.

Glossary

Expulsion

Molten metal ejected from a spot weld under too much current or too little force. A sign of a weak joint and a cause of surface damage.

Glossary

Springback

A stamped panel's elastic return after forming, which moves it off the die geometry. Predicted from material, die and press state.

Glossary

Film build

The thickness of a paint layer. Too thin fails corrosion and durability; too thick runs and sags. Controlled through flash, cure and application.

Glossary

Orange peel

A paint surface texture like citrus skin, from poor flow-out. A booth environment and application defect.

Glossary

Torque to yield

A fastening strategy that tightens a bolt into its yield region for a consistent clamp load. Judged from the full trace, not the final torque.

Glossary

Marriage

The station where body and chassis, or body and battery pack, are joined. A safety-critical, torque-controlled operation.

Glossary

Takt

The time between two vehicles leaving a station or the line. A car plant launches a vehicle roughly every 60 seconds.

Glossary

JIS and JIT

Just-in-sequence and just-in-time feeding of parts to the line in build order. Sequence-and-Flow optimises both.

Glossary

First-time-through

The share of vehicles that pass every station and test without rework. The plant manager's headline quality number.

Glossary

APQP and PPAP

Advanced product quality planning and production part approval, the automotive quality framework the reasoning layer cites.

Glossary

As-built record

The record of a vehicle: welds, measurements, paint readings, torque traces, test results, approvals, rework and disposition, written per vehicle.

Pilot baseline

What a plant brings to the first meeting

The inputs for a baseline agreed in writing.

About the process

  • Process or area, the programs it runs and their qualification status
  • Robot, press, weld, paint, metrology, torque, test and MES systems installed, with interfaces
  • How bodies and vehicles are recorded in the MES
  • Shift pattern and who approves process changes

About the losses

  • Weld and geometry rework per body, by station
  • Repaint rate and paint defects by type
  • Torque, fill, battery-joint and ADAS faults at end of line and in the field
  • Downtime minutes and andon causes
  • First-time-through and PPM by station
Reading

Where to go next

The pages that explain the mechanics.

Platform

Six layers, one loop

How the plant-edge runtime, orchestrator, agents, twin and cloud loop fit together.

Security

How software is allowed to touch a line

The write path, locked parameters, the audit record and the data governance.

Scenarios

Three labelled walk-throughs

What a pilot on the body shop, the paint shop or a pack line would do and measure.

Blog

Writing on the car plant and autonomy

A car every sixty seconds, autonomy as a dial, hit build quality before the shift.

Developers

Typed tools, declared limits

The SDK and CLI design previews.

Pricing

Per process, per plant, per fleet

Tiers, the comparison table and the arithmetic a plant runs.

Run timeline · scenario

One scenario shift, step by step

Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.

run_41a9c2 Plant BIW-2 · EV crossover body shop to end of line · shift 1 illustrative scenario SUCCEEDED
  1. 01 ingest.shift SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.

  2. 02 twin.simulate SUCCEEDED 1 m 40 s

    Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.

  3. 03 stamp.form SUCCEEDED continuous

    Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.

  4. 04 approve.human APPROVAL 3 m 12 s

    Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.

  5. 05 weld.join SUCCEEDED continuous

    Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.

  6. 06 frame.geometry SUCCEEDED continuous

    Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.

  7. 07 paint.finish SUCCEEDED continuous

    Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.

  8. 08 marriage.torque SUCCEEDED continuous

    Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.

  10. 10 eol.release SUCCEEDED 2 m 05 s

    EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.

Autonomy

Four levels, set per agent and per tag

A car plant does not go from manual to unattended in one step. Chassira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk loops. Weld schedules stay supervised until the joint family is qualified, and torque specifications and test verdicts are never written by an agent.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, metrology, vision, torque, test, robot and MES signals; predicts and recommends; writes nothingRuns the line as today; compares predictions to audit and engineer outcomesDesign partners start here; the baseline is measured from the plant's own records
L2 · AssistProposes weld, framing, paint, routing, holding and sequencing moves with evidence, confidence, envelope and rollback pathApproves each action in the review consoleAssist mode: accuracy and ROI proven against the signed baseline
L3 · BoundedExecutes pre-approved low-risk actions: booth environment, framing offsets, blank feed and lubrication, routing, holds, sequencing, inside PLC and safety limits and the qualified envelopeApproves weld-schedule changes, torque-related decisions and vehicle releaseGraduated autonomy, after audited accuracy and ROI
L4 · ScaledSupervised weld-schedule adaptation for qualified joint families, across lines and plantsSets the envelope; reviews the shift record and evaluation resultsPlanned; after golden-dataset evaluation, twin validation and quality sign-off. Torque specifications and test verdicts never leave human hands
Accelerated computing

Physical AI, at the line

A spot weld lasts a fraction of a second and a body passes a station every minute. Perception has to be local, deterministic and fast, so Chassira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

8 to 32 cameras per process area at 15 to 60 FPS, plus torque, dimensional, thermal, robot and paint-instrument streams fused at the cell. Weld and gap alerts under 50 ms and paint or dimensional prompts under 150 ms are the design targets. Jetson Thor is planned for higher density.

Triton · NIM

Model serving

Weld-defect, geometry-risk, paint-risk, torque and battery, and takt-risk models served at the plant edge with versioned rollback, routed by latency, tenant and cost, with canary rollout by line.

DGX or HGX · NeMo

Training

Weld, paint and gap vision, dimensional models, NeMo IATF and spec reasoning and GPU-accelerated stamping, springback and weld-geometry FEA surrogates. 150 to 600 GPU-hours per plant during onboarding, then monthly retraining from engineer corrections. Dedicated capacity is planned.

Omniverse · OVX

Plant twin

Body framing, weld sequence, robot reach, paint flow and line balance simulated before the shift. The pattern is production proven at BMW and Mercedes-Benz, per the architecture; Chassira's twin and OVX capacity are planned.

Cosmos · Omniverse Replicator

Synthetic data

Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated and validated against real distributions before promotion. 50,000 to 250,000 variants per program is the design target. Planned.

cuOpt

Optimisation

Line sequencing and JIS feeding, AGV routing, takt, line balancing, buffers and retest sequencing.

Isaac · Isaac ROS

Robot cells and AMRs

Robotic weld, paint, assembly and inspection cells and AGV and AMR line-feed autonomy, with skills validated in simulation before a cell runs them.

RAPIDS

GPU ETL

Telemetry ETL across weld and press parameters, measurements, paint readings, torque traces, battery and ADAS results, non-conformance and takt history for retraining and benchmarks.

NeMo Guardrails · NVIDIA AI Enterprise

Policy and deployment

Spec, IATF, functional-safety, cyber and human-approval policy enforced before any write; supportable on-prem or plant-edge deployment for regulated OEM plants.

FAQ

Straight answers

The questions plant managers, launch engineers and quality leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.

Get started

Bring the inputs, we bring the baseline

Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.