Robot and cell controllers (KUKA, FANUC, ABB, Yaskawa, Comau class systems)
Cell state, traces and paths; guarded writes inside interlocks
Chassira connects to the robot cells, presses, welding and joining controllers, paint systems, vision and metrology, torque tools, battery and end-of-line test stands, MES and AGV fleets already in a car plant and normalises their signals into one time-aligned record per body and vehicle. Writes go back through the same controllers, guarded.
Illustrative scenario: Plant BIW-2 · EV crossover body shop to end of line · shift 1, one approval gate
Chassira reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in car plants, not certified integrations; connector availability is confirmed per site.
Robot and cell controllers (KUKA, FANUC, ABB, Yaskawa, Comau class systems)
Cell state, traces and paths; guarded writes inside interlocks
Press lines and die protection (Schuler, AIDA class systems)
Force, stroke and feed reads; guarded feed and lube writes
Servo-gun, laser, rivet and adhesive controllers (Bosch Rexroth, FANUC servo-gun class systems)
Trace reads; schedule writes under engineer approval
Booths, ovens and paint robots (Dürr EcoPaint class systems)
Environment and profile reads; guarded booth writes
In-line vision and dimensional systems (Cognex, Keyence, ISRA Vision, Hexagon, Zeiss, Perceptron class systems)
Images, point clouds and measurements per body
Torque tools and traceability (Atlas Copco, Bosch Rexroth, Desoutter class systems)
Traces per fastener; specifications read-only
Pack, ADAS and end-of-line test systems (AVL, Dürr, Burke Porter class systems)
Results per unit; verdicts and limits read-only
Plant MES and twin platforms (Siemens Opcenter and Tecnomatix, Dassault DELMIA, Rockwell Plex, AVEVA, in-house OEM systems)
Sequence, control plans, as-built records; sequence writes inside limits
Fleet managers and line-feed logistics
Positions and tasks; routing inside agreed limits
Time-series store for telemetry, pgvector for defect and measurement images and spec retrieval
Backfill, replay, retrieval
NVIDIA Jetson Orin at the cell, on-prem GPU in the plant
Inference where the line runs
Vendor names are examples of the systems found in car plants, not certified integrations. Connector availability is confirmed during the shadow-mode weeks of a pilot.
| Category | Examples in the plant | What Chassira does |
|---|---|---|
| Robot cells | Robot and cell controllers (KUKA, FANUC, ABB, Yaskawa, Comau class systems) | Cell state, traces and paths; guarded writes inside interlocks |
| Presses and dies | Press lines and die protection (Schuler, AIDA class systems) | Force, stroke and feed reads; guarded feed and lube writes |
| Welding and joining | Servo-gun, laser, rivet and adhesive controllers (Bosch Rexroth, FANUC servo-gun class systems) | Trace reads; schedule writes under engineer approval |
| Paint systems | Booths, ovens and paint robots (Dürr EcoPaint class systems) | Environment and profile reads; guarded booth writes |
| Vision and metrology | In-line vision and dimensional systems (Cognex, Keyence, ISRA Vision, Hexagon, Zeiss, Perceptron class systems) | Images, point clouds and measurements per body |
| Torque and fastening | Torque tools and traceability (Atlas Copco, Bosch Rexroth, Desoutter class systems) | Traces per fastener; specifications read-only |
| Battery and EOL test | Pack, ADAS and end-of-line test systems (AVL, Dürr, Burke Porter class systems) | Results per unit; verdicts and limits read-only |
| MES, andon and sequencing | Plant MES and twin platforms (Siemens Opcenter and Tecnomatix, Dassault DELMIA, Rockwell Plex, AVEVA, in-house OEM systems) | Sequence, control plans, as-built records; sequence writes inside limits |
| AGV and AMR fleets | Fleet managers and line-feed logistics | Positions and tasks; routing inside agreed limits |
| Historian and stores | Time-series store for telemetry, pgvector for defect and measurement images and spec retrieval | Backfill, replay, retrieval |
| Edge | NVIDIA Jetson Orin at the cell, on-prem GPU in the plant | Inference where the line runs |
The shadow-mode weeks of a pilot.
Scope limits in version one.
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant.
Plan, thought, action, observation, exactly as the orchestrator would record it.
Run shift 1 on plant BIW-2 inside the qualified envelopes, hold body geometry at the framing station, keep expulsion and paint defects from escaping, hold every torque to specification and prove every vehicle at end of line.
Simulate weld-sequence, framing and booth candidates on the twin first. Lead with stamping so panels arrive in dimension, then propose the weld schedule and hold it for a human, then correct framing inside the envelope, then set the booth ahead of the colour block. Fuse inspection continuously. Never touch a torque specification or a test verdict.
The standing weld schedule on W-14 runs current high enough to guarantee the joint on the thickest stack. With the new coil lot and panel dimension held at P-3, the twin predicts the same joint quality at 2 percent lower current with a 20 ms hold, and lower expulsion, because the panels arrive flatter.
twin.simulate(candidates=18) returns #6: blank feed +0.4 mm on P-3, weld current -2 percent and +20 ms hold on W-14, framing offset -0.3 mm at FS-1, booth B-2 humidity -2 points for the dark block.
Candidate #6 predicts geometry inside targets, expulsion risk 0.06, a lower dirt map and takt at 61 seconds. Three candidates scored better on takt but pushed predicted B-pillar variation past the tolerance edge and were discarded.
Execute #6: six bounded writes permitted on stamping, framing, booth, routing and sequencing; the weld-schedule write routed to the body-shop launch engineer; torque specifications and test limits locked.
Dirt precursor in booth B-2 zone 3 at 07:40:02 before the humidity trim took effect. Two defects localised and routed to spot repair; none escaped. One pack held at marriage on a torque trace at 08:05:19.
Scenario complete. Geometry inside targets, no expulsion escapes, paint defects caught in station, one pack reworked, two ADAS retests passed inside takt. Shift 1 released with full as-built records.
A spot weld lasts a fraction of a second and a body passes a station every minute. Perception has to be local, deterministic and fast, so Chassira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
8 to 32 cameras per process area at 15 to 60 FPS, plus torque, dimensional, thermal, robot and paint-instrument streams fused at the cell. Weld and gap alerts under 50 ms and paint or dimensional prompts under 150 ms are the design targets. Jetson Thor is planned for higher density.
Weld-defect, geometry-risk, paint-risk, torque and battery, and takt-risk models served at the plant edge with versioned rollback, routed by latency, tenant and cost, with canary rollout by line.
Weld, paint and gap vision, dimensional models, NeMo IATF and spec reasoning and GPU-accelerated stamping, springback and weld-geometry FEA surrogates. 150 to 600 GPU-hours per plant during onboarding, then monthly retraining from engineer corrections. Dedicated capacity is planned.
Body framing, weld sequence, robot reach, paint flow and line balance simulated before the shift. The pattern is production proven at BMW and Mercedes-Benz, per the architecture; Chassira's twin and OVX capacity are planned.
Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated and validated against real distributions before promotion. 50,000 to 250,000 variants per program is the design target. Planned.
Line sequencing and JIS feeding, AGV routing, takt, line balancing, buffers and retest sequencing.
Robotic weld, paint, assembly and inspection cells and AGV and AMR line-feed autonomy, with skills validated in simulation before a cell runs them.
Telemetry ETL across weld and press parameters, measurements, paint readings, torque traces, battery and ADAS results, non-conformance and takt history for retraining and benchmarks.
Spec, IATF, functional-safety, cyber and human-approval policy enforced before any write; supportable on-prem or plant-edge deployment for regulated OEM plants.
Chassira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, safety-critical parameters are locked, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months, with an IATF and functional-safety-aware review |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| IATF 16949 and APQP assurance packages | Disposition and traceability evidence | QUEUED Planned, 6 to 12 months; not a certification claim |
| ISO 26262-aware control | Functional-safety requirements cited in reasoning and gates | RUNNING In the design; not a certification claim |
| Standards-cited reasoning | IATF 16949, APQP and PPAP, torque specs, recall procedures | RUNNING In the design, every answer cites its source |
| Per-tenant and program isolation | Designs, control plans, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Regulated OEM plants | RUNNING Design option |
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.
↑↓ navigate↵ openesc close