Trust before autonomy
Crash-safety and IATF gates, grounding, audit, human-in-the-loop and graduated control. The level is a dial the plant turns, and the weld schedule is the last thing it turns.
Chassira exists to give every vehicle plant a system that runs stamping, welding, framing, paint, marriage, assembly and end of line itself, to spec, at takt, with less rework, downtime and warranty, and to capture the launch engineer's craft before the EV and localisation wave spreads it too thin. The vision is to become the operations layer for the world's vehicle manufacturing.
To spec, at takt, with less rework, downtime and warranty, and capture the craft of the launch engineer before it disappears.
VisionBecome the operations layer for the world's vehicle manufacturing, where every panel is stamped, every body is welded and painted, every pack and powertrain is torqued, and every vehicle is launch-assured on Chassira.
The fact on the plant floor that started it.
Automakers ship around 90 million vehicles a year, each a safety-critical machine of roughly 30,000 parts built to millimetre geometry and Newton-metre torque on lines that launch a car about every 60 seconds. A body-shop geometry drift, a paint-film defect, a mis-torqued fastener or a mis-calibrated ADAS sensor triggers rework, line stops at tens of thousands of dollars a minute, warranty claims and recalls that run to billions.
Most plants run this on sampled inspection, andon reaction, siloed cell PLCs and the tribal knowledge of launch engineers. Robot lines execute fixed programs. Vision stations flag defects after the fact. MES dashboards monitor. Nobody closes the loop across body, paint, powertrain and final.
The principles we work by.
Crash-safety and IATF gates, grounding, audit, human-in-the-loop and graduated control. The level is a dial the plant turns, and the weld schedule is the last thing it turns.
Every supervised correction trains the system. The closed-loop chain from panel to weld to geometry to paint to torque to test to disposition is the asset.
One process, one metric, one baseline agreed in writing. Then the plant. Then the fleet.
Every answer from the reasoning layer carries its source. Every action carries its evidence and its envelope.
Vehicle designs, control plans, models and memory never cross an OEM boundary. On-prem for those who need it.
Figures are design targets until they are measured. Scenarios are labelled scenarios. Standards are cited, not claimed.
For anyone checking eligibility or category.
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
Figures are the company's own estimates.
Chassira is led by its founder and CEO, Thomas Bradford, and its CTO, Brian Sullivan. The profiles below describe what each of them owns and the ground they cover.
Founder & CEO
Thomas runs the company and owns the design-partner relationships, the pilot structure and the commercial model. He decides which vehicle plant and which assembly stage go first, what first-time-quality, rework, torque-escape or takt number a pilot is judged on, and who at the plant signs off on the baseline.
Focus: automotive vehicle assembly operations, plant economics, OEM and supplier partnerships, and go-to-market.
CTO
Brian owns the line-edge runtime, the torque, fastening, fit-and-finish and end-of-line inspection models, the as-built vehicle digital twin, and the audit architecture behind every Chassira agent. He is accountable for the bounded, logged write-back into tools, robots and line controls, and for every agent starting in shadow mode.
Focus: edge computer vision, robotics and tool control, simulation and digital twins, safety-critical industrial software.
The founding roles we expect to open are on the careers page: edge perception, controls and OT integration, simulation, and a body, paint or assembly process engineer.
Automakers ship around 90 million vehicles a year, each of roughly 30,000 parts, to millimetre geometry and Newton-metre torque, on lines that launch a car about every minute. Most of that is still judged after the fact.
A car plant does not go from manual to unattended in one step, and the crash-safety joints should not be the first thing an agent moves.
Plants commit a shift of bodies to a weld sequence, a framing setup and a booth recipe before they know the result. The twin changes the order.
A spot weld lasts a fraction of a second and a body passes a station every minute. Perception has to be local, deterministic and fast, so Chassira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
8 to 32 cameras per process area at 15 to 60 FPS, plus torque, dimensional, thermal, robot and paint-instrument streams fused at the cell. Weld and gap alerts under 50 ms and paint or dimensional prompts under 150 ms are the design targets. Jetson Thor is planned for higher density.
Weld-defect, geometry-risk, paint-risk, torque and battery, and takt-risk models served at the plant edge with versioned rollback, routed by latency, tenant and cost, with canary rollout by line.
Weld, paint and gap vision, dimensional models, NeMo IATF and spec reasoning and GPU-accelerated stamping, springback and weld-geometry FEA surrogates. 150 to 600 GPU-hours per plant during onboarding, then monthly retraining from engineer corrections. Dedicated capacity is planned.
Body framing, weld sequence, robot reach, paint flow and line balance simulated before the shift. The pattern is production proven at BMW and Mercedes-Benz, per the architecture; Chassira's twin and OVX capacity are planned.
Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated and validated against real distributions before promotion. 50,000 to 250,000 variants per program is the design target. Planned.
Line sequencing and JIS feeding, AGV routing, takt, line balancing, buffers and retest sequencing.
Robotic weld, paint, assembly and inspection cells and AGV and AMR line-feed autonomy, with skills validated in simulation before a cell runs them.
Telemetry ETL across weld and press parameters, measurements, paint readings, torque traces, battery and ADAS results, non-conformance and takt history for retraining and benchmarks.
Spec, IATF, functional-safety, cyber and human-approval policy enforced before any write; supportable on-prem or plant-edge deployment for regulated OEM plants.
Chassira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, safety-critical parameters are locked, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months, with an IATF and functional-safety-aware review |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| IATF 16949 and APQP assurance packages | Disposition and traceability evidence | QUEUED Planned, 6 to 12 months; not a certification claim |
| ISO 26262-aware control | Functional-safety requirements cited in reasoning and gates | RUNNING In the design; not a certification claim |
| Standards-cited reasoning | IATF 16949, APQP and PPAP, torque specs, recall procedures | RUNNING In the design, every answer cites its source |
| Per-tenant and program isolation | Designs, control plans, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Regulated OEM plants | RUNNING Design option |
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
↑↓ navigate↵ openesc close