Typed, ordered, inspectable
A run is a goal, a plan and a graph of typed steps. Every step has an agent, a tool, a duration and a status, and the whole record is kept per body and vehicle.
Chassira's features are the mechanics of a system that is allowed to touch production equipment: typed runs, a policy engine, locked parameters, named approvals, fused inspection, a twin, the as-built record and an audit log. The list below is design scope, not a shipped feature list.
Illustrative scenario: Plant BIW-2 · EV crossover body shop to end of line · shift 1, one approval gate
Each capability names what it does and where its limit sits.
A run is a goal, a plan and a graph of typed steps. Every step has an agent, a tool, a duration and a status, and the whole record is kept per body and vehicle.
Tag allow-lists, per-tag rate and magnitude limits, the qualified envelope, autonomy level, shift, program and interlock state are evaluated before any setpoint moves. NeMo Guardrails enforces spec, IATF, functional-safety and approval policy.
Torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent. Weld schedules wait for a named engineer until the joint family is qualified.
Weld-schedule changes, torque-related decisions and vehicle release wait for the approver the plant names. The request, the evidence and the decision are logged.
Gap-and-flush and paint-defect vision, weld and torque traces, in-line metrology and test results fused into one build-quality model per vehicle, localised to station, robot, tool and body.
Candidate weld sequences, framing offsets, booth windows and line balances ranked on geometry, defect map, expulsion risk and takt before a setpoint moves.
Welds, measurements, paint readings, torque traces, test results, approvals, rework and disposition, exportable for launch, IATF, APQP and warranty review.
Process and quality engineers see recommendations with their evidence, approve or correct them, and those corrections train the models.
Every agent action with source evidence, the approved envelope, confidence, predicted quality, rework, downtime and warranty impact, rollback path, approver and vehicle scope.
Retrieval over weld, paint and torque specs, APQP and PPAP control plans, IATF 16949, ISO 26262-aware requirements and recall procedures, tenant-isolated.
Per-plant and per-program build-quality history and per-station and per-robot performance memory, versioned and scoped per tenant.
Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated with Cosmos and Omniverse Replicator and validated against real distributions before promotion. Planned.
Every Chassira run is an ordered, inspectable sequence. This is run_41a9c2 on Plant BIW-2 · EV crossover body shop to end of line · shift 1. Scenario completes in 10 steps with one approval gate. Weld schedule change on robot W-14 approved by the body-shop launch engineer, framing offset held inside the envelope, booth humidity trimmed before the predicted dirt defects appeared, one pack held at marriage on a torque trace, and the shift released with full as-built records.
Plant Orchestrator · Pulled the shift build sequence, program control plan and qualified envelopes from MES: 412 bodies, four trim variants, weld schedule set W-rev 7, framing targets per station, paint colour blocks, torque specifications. Locked every safety-critical parameter as read-only.
Vehicle-and-Line Twin · Simulated 18 candidate weld-sequence, framing-offset and booth-window combinations on the plant twin, ranked on predicted body geometry, expulsion risk at robot W-14, paint defect map and takt against launch cadence.
Stamp-and-Form · Blank feed on press line P-3 adjusted by 0.4 mm and lubricant dose raised 3 percent for the new coil lot as springback risk on the rear door inner climbed. Panel dimension held inside the window; genealogy handed to framing.
Plant Orchestrator · Candidate #6 lowers weld current 2 percent and adds 20 ms hold on robot W-14 to cut predicted expulsion. Weld schedules are crash-safety critical and stay with a human, so the change was held for the body-shop launch engineer and approved at 06:14:52.
Weld-and-Join · Approved schedule 7b applied on W-14. Current and force traces confirmed inside the window on the first 40 bodies; predicted expulsion risk fell from 0.31 to 0.06 and no geometry debt was introduced at the adjacent seams.
Frame-and-Geometry · Framing station FS-1 offset corrected by 0.3 mm on the left B-pillar datum inside the qualified envelope as in-line measurement trended toward the tolerance edge. Gap-and-flush vision confirmed the correction on the next 25 bodies.
Paint-and-Finish · Booth B-2 humidity trimmed 2 points and airflow rebalanced for the dark-colour block as the defect model predicted dirt on horizontal panels. Film build held inside the window on the first colour block.
Powertrain-and-Battery · Pack PK-1182 held at marriage after a torque-to-yield trace on fastener 7 fell outside the specification curve. Routed to rework with the trace attached; torque specification untouched, as always.
Quality-and-Anomaly · Gap-and-flush and paint-defect cameras, weld and torque traces and test results fused per body. Two paint dirt defects localised to booth B-2 zone 3 before the humidity trim took effect; both routed to spot repair, none escaped to final.
EOL-and-Calibrate · End of line proved alignment, ADAS calibration, leak, brake, roll and functional tests on every vehicle; two ADAS retests sequenced inside takt. Shift 1 released with as-built records, approvals and dispositions written for the quality lead.
Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant.
Plan, thought, action, observation, exactly as the orchestrator would record it.
Run shift 1 on plant BIW-2 inside the qualified envelopes, hold body geometry at the framing station, keep expulsion and paint defects from escaping, hold every torque to specification and prove every vehicle at end of line.
Simulate weld-sequence, framing and booth candidates on the twin first. Lead with stamping so panels arrive in dimension, then propose the weld schedule and hold it for a human, then correct framing inside the envelope, then set the booth ahead of the colour block. Fuse inspection continuously. Never touch a torque specification or a test verdict.
The standing weld schedule on W-14 runs current high enough to guarantee the joint on the thickest stack. With the new coil lot and panel dimension held at P-3, the twin predicts the same joint quality at 2 percent lower current with a 20 ms hold, and lower expulsion, because the panels arrive flatter.
twin.simulate(candidates=18) returns #6: blank feed +0.4 mm on P-3, weld current -2 percent and +20 ms hold on W-14, framing offset -0.3 mm at FS-1, booth B-2 humidity -2 points for the dark block.
Candidate #6 predicts geometry inside targets, expulsion risk 0.06, a lower dirt map and takt at 61 seconds. Three candidates scored better on takt but pushed predicted B-pillar variation past the tolerance edge and were discarded.
Execute #6: six bounded writes permitted on stamping, framing, booth, routing and sequencing; the weld-schedule write routed to the body-shop launch engineer; torque specifications and test limits locked.
Dirt precursor in booth B-2 zone 3 at 07:40:02 before the humidity trim took effect. Two defects localised and routed to spot repair; none escaped. One pack held at marriage on a torque trace at 08:05:19.
Scenario complete. Geometry inside targets, no expulsion escapes, paint defects caught in station, one pack reworked, two ADAS retests passed inside takt. Shift 1 released with full as-built records.
Chassira is not a dashboard. Each agent closes a loop a plant already measures in rework per body, repaint rate, faults escaping to end of line and downtime minutes. The tables show what each loop watches and what it is allowed to move.
Servo-gun traces, seam vision and in-line measurement are fused at the cell into one estimate of joint quality and body geometry. Weld-and-Join proposes the schedule and sequence that hold crash-safety quality without geometry debt, the body-shop engineer approves, and Frame-and-Geometry corrects the framing station inside its envelope.
| Signal | Watches | Moves |
|---|---|---|
| Weld current and force | Servo-gun trace per joint | Schedule proposal, under approval |
| Expulsion | Trace and seam vision | Current and hold, under approval |
| Body dimension | In-line measurement | Framing offset inside the envelope |
Booth temperature, humidity and airflow, film build and oven profiles are read per body and colour block. Paint-and-Finish predicts the defect map a body will carry and trims the booth inside the qualified window ahead of it; paint-defect vision localises what still appears to zone and condition.
| Signal | Watches | Moves |
|---|---|---|
| Booth environment | Temperature, humidity, airflow sensors | Setpoints inside the window |
| Film build | Film-build gauges | Flash and cure profile |
| Dirt, runs, orange peel | Paint-defect vision | Zone routing, spot-repair request |
Torque-to-yield traces, cell-to-pack joining signals, fill volumes and glazing vision are scored per fastener and per vehicle. Powertrain-and-Battery and Trim-and-Fasten hold and route units before a fault reaches end of line. Torque specifications and joint parameters are never written by an agent.
| Signal | Watches | Moves |
|---|---|---|
| Torque to yield | Tool trace per fastener | Unit hold and routing |
| Pack integrity | Joining, coolant and HV tests | Hold, proposal to engineer |
| Fluid fill | Volume and pressure | Fill setpoints inside the window |
End-of-line results are fused with the upstream build record to predict failures before the stand sees them, and retests are sequenced inside takt. Sequence-and-Flow prices every sequence and buffer move in minutes and rework and optimises feeding and routing with cuOpt against launch cadence.
| Signal | Watches | Moves |
|---|---|---|
| ADAS calibration | Test-stand result | Retest sequencing |
| Alignment, leak, brake, roll | Test-stand results | Rework routing |
| Takt and buffers | MES, AGV and AMR state | Sequence and buffer targets |
A car plant does not go from manual to unattended in one step. Chassira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk loops. Weld schedules stay supervised until the joint family is qualified, and torque specifications and test verdicts are never written by an agent.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Shadow | Reads weld, metrology, vision, torque, test, robot and MES signals; predicts and recommends; writes nothing | Runs the line as today; compares predictions to audit and engineer outcomes | Design partners start here; the baseline is measured from the plant's own records |
| L2 · Assist | Proposes weld, framing, paint, routing, holding and sequencing moves with evidence, confidence, envelope and rollback path | Approves each action in the review console | Assist mode: accuracy and ROI proven against the signed baseline |
| L3 · Bounded | Executes pre-approved low-risk actions: booth environment, framing offsets, blank feed and lubrication, routing, holds, sequencing, inside PLC and safety limits and the qualified envelope | Approves weld-schedule changes, torque-related decisions and vehicle release | Graduated autonomy, after audited accuracy and ROI |
| L4 · Scaled | Supervised weld-schedule adaptation for qualified joint families, across lines and plants | Sets the envelope; reviews the shift record and evaluation results | Planned; after golden-dataset evaluation, twin validation and quality sign-off. Torque specifications and test verdicts never leave human hands |
A spot weld lasts a fraction of a second and a body passes a station every minute. Perception has to be local, deterministic and fast, so Chassira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
8 to 32 cameras per process area at 15 to 60 FPS, plus torque, dimensional, thermal, robot and paint-instrument streams fused at the cell. Weld and gap alerts under 50 ms and paint or dimensional prompts under 150 ms are the design targets. Jetson Thor is planned for higher density.
Weld-defect, geometry-risk, paint-risk, torque and battery, and takt-risk models served at the plant edge with versioned rollback, routed by latency, tenant and cost, with canary rollout by line.
Weld, paint and gap vision, dimensional models, NeMo IATF and spec reasoning and GPU-accelerated stamping, springback and weld-geometry FEA surrogates. 150 to 600 GPU-hours per plant during onboarding, then monthly retraining from engineer corrections. Dedicated capacity is planned.
Body framing, weld sequence, robot reach, paint flow and line balance simulated before the shift. The pattern is production proven at BMW and Mercedes-Benz, per the architecture; Chassira's twin and OVX capacity are planned.
Rare weld defects, paint failures, geometry-drift modes, occluded joints and misbuild cases generated and validated against real distributions before promotion. 50,000 to 250,000 variants per program is the design target. Planned.
Line sequencing and JIS feeding, AGV routing, takt, line balancing, buffers and retest sequencing.
Robotic weld, paint, assembly and inspection cells and AGV and AMR line-feed autonomy, with skills validated in simulation before a cell runs them.
Telemetry ETL across weld and press parameters, measurements, paint readings, torque traces, battery and ADAS results, non-conformance and takt history for retraining and benchmarks.
Spec, IATF, functional-safety, cyber and human-approval policy enforced before any write; supportable on-prem or plant-edge deployment for regulated OEM plants.
Chassira writes to production equipment. Every capability is scoped, every write is policy-checked against the qualified envelope, safety-critical parameters are locked, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months, with an IATF and functional-safety-aware review |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| IATF 16949 and APQP assurance packages | Disposition and traceability evidence | QUEUED Planned, 6 to 12 months; not a certification claim |
| ISO 26262-aware control | Functional-safety requirements cited in reasoning and gates | RUNNING In the design; not a certification claim |
| Standards-cited reasoning | IATF 16949, APQP and PPAP, torque specs, recall procedures | RUNNING In the design, every answer cites its source |
| Per-tenant and program isolation | Designs, control plans, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Regulated OEM plants | RUNNING Design option |
The questions plant managers, launch engineers and quality leads ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the qualified envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Chassira writes nothing. Weld-schedule changes wait for a named body-shop engineer, and torque specifications, battery-joint parameters and end-of-line test limits and verdicts are read-only to every agent, always.
Control returns to the press, robot, booth or MES controller's last known-good state. Chassira is a supervisory layer on top of the safety-rated PLCs and interlocks you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the plant twin and the control plan in the first weeks. Weld, geometry, paint, torque and end-of-line prediction improve as line history and labelled outcomes accumulate per program. The compute plan sizes onboarding at 150 to 600 GPU-hours per plant and 50,000 to 250,000 synthetic variants per program, all design targets.
Only if you choose cloud training. Designs, control plans, specs, process models and quality records are isolated per tenant and never used to train another OEM's models. On-prem and plant-edge deployment are available for regulated plants, and federated cross-plant learning is planned and waits on data-rights agreements.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything crash-safety or IATF relevant waits for a named approver. The audit log records the request, the evidence, the envelope applied and the human decision.
A paid pilot on one process or area at the Process tier, scoped to a single wedge with a success metric written into the order form: weld or geometry rework, downtime minutes, paint defect or repaint rate, warranty or PPM, or launch quality. Shadow mode first, then assist mode with your engineer approving each move, then bounded autonomy on low-risk loops once ROI and safety gates are met.
Start with one process and one measurable baseline. A paid pilot on body-shop weld and gap-and-flush vision, paint-defect detection and film-build control, or torque and battery-joint conformance shows the number before you commit further.